Home / microfluidic application note / Setup: microfluidic flow control / OB1 pressure controller: How to install out of the box
Microfluidics application note

Published on 27 August 2019

Unboxing-OB1-MK3+--Miniature1

Unboxing-OB1-text

A series of videos produced specifically to provide our customers with the best experience.

Step by step, we guide you to install your OB1 pressure controller, install and connect reservoirs and flow sensors. A dedicated part shows the ESI software installation and the calibration needed as you use it for the first time.

 

Install your OB1: Unboxing

Package design:

We designed the OB1 packaging with optimal shock and vibration protection.

 

Install your OB1: What’s in the pack?

Inside the box:

  • OB1 MK3+ pressure controller
  • ESI Elveflow Smart Interface inside a USB flash drive
  • Flow sensors (depending on your options)
  • Kit Fittings Pressure source Quick connect to connect the OB1 to the pressure source.
  • Kit Fittings 1/4-28″ are Teflon end fittings with 1/4″-28 thread with Ferrules for 1/16 OD tubing.
  • Kit Luer Lock Instrument is the 3/32 ID Tygon tubing and the adapters to connect the OB1 or AF1 pressure outlet to 3/32 Tygon tubing.
  • Kit Reservoirs Tank M is the anodized falcon adapter cap (we also have the following sizes: 1.5, 15, 50 and 100mL)
  • Kit Tubing Coil PTFE 1/16″ OD x 1/32 ID (10m) is the adapted tubing to connect the reservoirs to your chip.
  • Pneumatic Polyurethane (PU) Flexible Tubing
  • Power supply unit
 

Install your OB1: Reservoirs installation

Elements needed:

  • Kit Fittings 1/4-28″ are Teflon end fittings with 1/4″-28 thread with Ferrules for 1/16 OD tubing.
  • Kit Luer Lock Instrument is the 3/32 ID Tygon tubing and the adapters to connect the OB1 or AF1 pressure outlet to 3/32 Tygon tubing.
  • Kit Reservoirs Tank M is the anodized falcon adapter cap (we also have the following sizes: 1.5, 15, 50 and 100mL)
  • Kit Tubing Coil PTFE 1/16″ OD x 1/32 ID (10m) is the adapted tubing to connect the reservoirs to your chip.
 

Flow sensors installation

Elements needed:

  • Flow sensors (depending on your options)
  • Kit Fittings 1/4-28″ are Teflon end fittings with 1/4″-28 thread with ferrules for 1/16 OD tubing.
  • Kit Tubing Coil PTFE 1/16″ OD x 1/32 ID (10m) is the adapted tubing to connect the reservoirs to your chip.
 

Connectors for the OB1

Elements needed:

  • OB1 MK3+ pressure controller
  • Kit Fittings Pressure source Quick connect to connect the OB1 to the pressure source.
  • Kit Luer Lock Instrument is the 3/32 ID Tygon tubing and the adapters to connect the OB1 or AF1 pressure outlet to 3/32 Tygon tubing.
  • Pneumatic Polyurethane (PU) Flexible tubing
  • Power supply unit
 

[ob1f_rebound]

ESI software installation

Elements needed:

 

First calibration

Elements needed:

Contact
How can we help you?
Quoteor technical request Job application Job
application
Collaboration or partnerships Collaborations
or partnerships
Customer support Customer
support
Others questions Other

    For more information or Technical discussion

    Contacting for
    a job application?
    We are happy that you are interested in Elveflow. You can apply to our open jobs or send us your open application on WelcomeToTheJungle. Over here!

      For more information or Technical discussion

        Need customer support?







        I hereby agree that Elveflow uses my personal data

          For more information or Technical discussion